Primary Bedroom & Sunroom Flooring with Exterior Repairs

Primary Bedroom & Sunroom Flooring with Exterior Repairs

Toms River, NJ

This project began with new flooring throughout the primary bedroom, walk-in closet, and sunroom. In the bedroom, we removed the existing baseboards, carried the new flooring seamlessly into the walk-in closet, and installed new baseboards with the nail holes filled and joints caulked. The sunroom required additional subfloor preparation and a new transition connecting it to the kitchen. We carefully removed and reinstalled the existing trim to complete the room.

During the sunroom installation, we discovered half-inch PVC incorporated into a previous subfloor repair. Further investigation revealed that the underlying damage had never been properly corrected and that the exterior sliding door was still actively leaking. Through a change order, we removed the slider, addressed the water-intrusion issue, reinstalled the door correctly, repaired the affected area, and completed the flooring installation.

We also corrected the home’s bathroom exhaust ventilation. Two bathroom fans had been improperly connected together in the attic and exhausted through the gable vent. We separated the ducts and vented each bathroom independently through the soffit. Additional soffit vents were installed along both sides of the home to improve attic airflow.

While completing the exterior ventilation work, we identified that the roofline lacked proper drip edge and recommended evaluation by a roofing contractor. The homeowners subsequently hired a roofer to replace the roof.

The Transformation

Before & After

Before
After

Scope of Work

  • Removed the existing baseboards in the primary bedroom

  • Installed new flooring throughout the primary bedroom and into the walk-in closet

  • Installed new flooring in two hallway closets

  • Installed new baseboards in the primary bedroom, filled the nail holes, and caulked the joints

  • Prepared and leveled areas of the sunroom subfloor

  • Installed new flooring throughout the sunroom

  • Created a finished transition between the kitchen and sunroom

  • Carefully removed and reinstalled the sunroom’s existing trim

  • Investigated a concealed, previously attempted subfloor repair

  • Identified an active water leak at the exterior sliding door

  • Removed the slider, corrected the water-intrusion issue, and reinstalled the door properly

  • Repaired the affected subfloor and completed the flooring installation

  • Separated two improperly combined bathroom exhaust ducts

  • Individually exhausted both bathroom fans through the soffit

  • Installed additional soffit vents along both sides of the home to improve attic airflow

  • Identified the absence of roofline drip edge and recommended evaluation by a roofing contractor

Project Highlights

  • New flooring installed in the primary bedroom, walk-in closet, two hallway closets, and sunroom

  • Clean flooring transition completed between the kitchen and sunroom

  • Concealed water damage discovered before the new floor was installed

  • Active slider leak corrected instead of covering over the underlying problem

  • Improperly combined bathroom exhaust ducts separated and correctly vented

  • Attic airflow improved with additional soffit ventilation

  • Missing drip edge identified, leading the homeowners to have the roof professionally replaced